Adventurer Project – Exploring the House

By Projects No Comments

Hi, and appreciate you’re following the progress we’ve made.  I teased in earlier posts about talking about the rest of the house beyond the great room so here we go.  I’ve struggled with creating this post because some rooms are so much harder to photograph than the great room but I’ll do my best to show what we have planned for the rest of the house.

Here is an overview of what the west side of the house looks like.  Picture is taken from the kitchen in the great room (east side)  looking at this side of the house

West Side Rooms

And here is the same view,  with drywall and taping underway.

West Side Rooms

 

This is the view of the guest room just off of the great room. It has a nice feel with the big window looking out to the green belt.  The green belt and yard are projects that deserve their own posts and that will happen, but suffice to say we’ve been working on them while the house moves forward.

You can see a sliver of a working toilet.  That has been in place since we started the project and probably could have it’s own post as it’s been functional but not very aesthetic especially before we had any walls.  Appreciate contractors who can deal with our managing costs by using existing infrastructure.

Guest Room and Bath

 

Next to the guest room is Renee’s office.  There won’t be a door on it so she can appreciate the view.  Her office wouldn’t have been possible in the original house because there was a mammoth fireplace taking up most of the space.  I really struggled with removing it because it seemed like it would be such a big job but that wasn’t  the case and her office is a much better use of the space.

Renee’s Office

Here is what the fireplace looked like from roughly the same spot Renee’s office picture was taken from.  This picture is in the family room and does a good job of highlighting our 8’ ceilings.  This space was the worst offender for making low ceilings feel even lower than they were.  We’ve chosen to use can lights throughout the house to keep light fixtures from interrupting  the clean open ceiling.

Family Room Fireplace

 

Looking down the hallway is the media room which is really a 3rd bedroom.  You can see we framed 2 closets but only the small one will have a door.  That will satisfy the rules for it being a bedroom and I can stuff a tricked out TV in the big closet without doors.  Bring on the Super Bowl.  The cables on the wall are for mini split head which provides heat/air conditioning.  AC isn’t a big deal where we live but may turn out to be useful because this room is on the west side of the house and can get a lot of afternoon sun.

Media Room

 

We’ve moved down the hallway into the master bedroom.  It’s walls are all original to the house so it’s a big room.  It has a western exposure, so same as the media room where a mini split provides heat and A/C.  The western exposure means no view of the Salish Sea but it looks out to a green belt which you can see thru the windows and gives it a nice feel.

Let’s peek into that doorway on the left.

Master Bedroom

It leads to the master bath.  Shower sits in the corner and will get it’s own post.  Shower walls are glass with digital artwork that tested Renee’s create juices which is hard to do, more to follow about those details.

Next to the shower is the vanity with future base cabinets and quartz countertop.  The vanity wall has a 4” profile to allow two medicine cabinets with tricked out mirrors with a niche beneath to minimize countertop clutter.  Toilet is just out of view under the window.  There will be a heated floor under tile.

Master Bath

And off the bathroom is our walk in closet.  Sorry, this is the best photo I can show as I don’t have the skills or equipment to show smaller rooms.  We added a skylight since it’s an interior room and wouldn’t have any natural light without it.

Walk in Closet

 

So that’s a tour of much of the rest of the house.  Rooms I haven’t shown include a powder room, laundry, and my office but I’ll wait on showing them until I upgrade my photo skills.

I’ll wrap this up with this picture of the great room which has been taped and almost ready for paint.  Look closely and you can see blue tape marking imperfections my taper found,  there’s a lot of them.  He fixed them so we can have a smooth wall finish throughout the house which means no texture.  It’s a clean look that fits this house well.

We’re just about finished with the slogging I referred to in my last post and getting ready to start doing the projects that get shown on HGTV where floors are laid, cabinets installed,  and final finishes happen.  Couldn’t be happier we’re at this point and my tease for this post is I’m really looking forward to creating the next one.  Thanks for reading.

Adventurer Project – Working Thru the Slog

By Projects

Welcome back, we’re in the slog part of the project I find very challenging.  Slogging means we’re doing the infrastructure projects necessary for the house to function so we can move the project forward.  Our envelope has been created,  foundation and framing are done and the house is sealed.  Now we need to have all the things built out that make the house function,  like plumbing, electrical, heat and insulation.  It’s boring, takes too long, and most of it gets covered up.  That said,  it’s really important and needs to be done right.  I show this picture because it was a good day with lots of subs onsite making things happen. I think you’re seeing plumbers,  gutters, and contractors.  Days like this don’t happen often enough and help to make the slog worth it.

Sub vehicles in my driveway

Lots of subs onsite doing what they do

 

My biggest challenge is keeping track of the all the details of the project.  So many vendors and trades, so many inbound and outbound phone calls, so many different folks onsite.  To keep track of it all I created this spreadsheet.  Day of the month for headings, different projects by month on the rows,  time needed in the columns.  The projects are sequenced by critical path whenever possible.  Green bars are scheduled,  yellow isn’t scheduled yet but pending,  and red isn’t a good thing.  Wish I’d invented it but I stand on the shoulders of giants.  It’s the best view I have on project status for what needs to be done, yet in another sense it’s a fantasy because there are so many variables and constant change.  I feel like I have some control but accept that the chart has to be massaged pretty much daily.

Project Scheduling

 

So, let’s take a tour and see the progress we’ve made.  As I said, we’re slogging right now but that’s necessary to get onto the next stage.   Here’s the new entry way which is a blank palette right now.  Renee and I are of the mind that the entry establishes our home’s feel and are starting to have visions of what could be.  We want it to be inviting and capture the natural feel of where we live.  She is a Master Gardener so there will be lots of plants and trees surrounding the entry and probably a cool planter or maybe some sculpture.  The door you see is a temporary dunnage door which will be replaced with the permanent door when construction is further along.

Entryway in Process

This is a before picture.  I won’t miss the giraffe rock.

Entry before

 

So let’s step inside on the tour.  First stop is after you’ve walked thru the front door and thru the entry way into the great room.  I’ll explain that shortly.  You’re looking into the kitchen and with a bit of imagination can see that the framed wall (center of the picture) will have our refrigerator next to upper/lower cabinets and the induction cooktop with lowers and kitchen sink against the exterior wall. There is a big island where that 2/10 electrical cable is coiled up on the floor.  The man door leads to the covered deck.  Laundry room and my office are behind the framed wall.

Great Room – Kitchen

 

Here is looking to the other end of the great room from the kitchen.  Lot of thought into making this space happen.  Again, the island sits where the coiled cable is on the floor but otherwise the rest of the space is a blank palette that will become our living and dining rooms.  There’s a spirted discussion going on about which room goes where so stay tuned to see what we decide.  Man door at the end of the room leads to more deck on the south side of the house where we get sun when it’s out.  The fireplace is propane and our alternate heat source if the electricity goes out.

Great Room – Living & Dining

 

Here’s a view of the other side of the kitchen space looking down a hallway leading to the back half of the house with bedrooms and bathrooms.  Those are topics for a future post.  To the right of the hallway is the front door behind that 3/4 wall. This side of the 3/4 wall is an appliance carport which will be installed on the framing behind the garbage cans.  If you don’t know what an appliance carport is you’re not alone and that too will be a future post.  Try googling it and you don’t get many hits because it’s not very common. It is Renee’s inspiration when she’s in full on creative mode.  It’s a bit hard to explain but imagine an appliance garage without any doors that looks attractive.  I’ll do a future post to show what she’s come up with, I think it’s pretty cool.  To the right of the carport is the new pantry.  And another shameless plug for my girder truss which in running down the middle of the picture in the ceiling, sorry, can’t help it.  None of the great room would be possible without it.

Great Room – Appliance Carport

 

So let’s wrap up with this picture of the 3/4 wall, but just after you’ve walked in the front door.  It’s 5’ tall leaving 3’ of open space to the ceiling so you won’t really see the kitchen but will have the feeling it’s there.  The opening looking into the great room frames the view from the big windows but you only get to see part of it so again teases you about what’s there.  The intent is to give clues about what’s above and behind the wall when you walk in and invites you to come inside and find out more.  We  thought a lot about this and like the idea of some mystery,  looking forward to seeing how it turns out.

Entryway – Inside

 

So we’re close to wrapping up the slog with insulation and drywall being the last steps.  Then we get to start doing projects that are much more exciting because they get us back upstairs.  Still too early to forecast when but Renee does have a birthday at the end of May.  Could be the best present ever.

Thanks for reading, appreciate your support and look forward to the next post.

Adventurer Project – We Have a Roof

By Projects

Welcome back, this post is all about hitting a major milestone in the project where we finished installing the new roof.  Living with plywood and tarps as substitutes for roofing gets old, and dealing with water on the main floor was beyond tiresome.  For those who don’t know our living situation: the house is two stories and we’re remodeling the upper level and living in a MIL apartment on the lower level.  Water never made it downstairs but there were some stressful times.

 

There were lots of things going on to reach this milestone so let’s break them down.

 

Roof to be replaced

Roof to be replaced with the guard dog on duty

This picture highlights the part of the roof we had to replace to open up the main floor.  The entire roof is constructed of trusses and we needed to replace 12 of them to accommodate the girder truss I discussed in the last post.  Installing it meant we could remove the wall under it and have a great room that includes the kitchen, dining, and living rooms.  Doing this was central to the design of the house and allows us to highlight the view we have of the Salish Sea.

Look carefully and you can see there’s a chimney which was the exit for a large fireplace.  We removed it last fall and were left with a gaping hole in the roof.  A sheet of plywood solved that problem but wasn’t completely water tight,  just mostly.  The chimney wasn’t the only hole in the roof as the project moved forward so we learned to pay attention whenever an atmospheric river was forecast.

 

 

Blue Tarp Living

Living the Dream under Blue Tarps

There were lots of concerns about opening up the roof mid winter because making all the parts of that project fit together was really challenging with our typically unpredictable winter weather.  We needed several days between starting tear off and resheeting the new roof with plywood.  In between those steps included removing old trusses and installing new ones so tarping the exposed roof was critical.  The challenge is having something in place to support tarps during the transition.  This is what we looked after the roofing was removed but the old trusses were still in place.  And yes,  I know that’s a lot of gray tarps but blue tarps are industry standard and we just weren’t able to meet it.

 

 

 

First Truss Install

Roof Off, First Truss Installed

Old roof and trusses are in the dumpster, this is the first trust being installed,  and that big pile on the ground soon followed.

 

 

Girder Truss Install

Girder Truss Installation

Here is the girder truss after it has been installed, it’s the one that looks like a big beam made out of 2×6 lumber. The other half of the roof is being hung off of it and you can see there’s no wall under it any more.  It’s pretty wonky technically  and I apologize for my obsession with it, but it’s been the biggest challenge we’ve faced.  It took 2 engineers, an experienced crew, and some breaks in the weather to get us to this point.  Sort of disappointing that all that time and energy will be covered up with drywall.   Fortunately we’re past it now and can focus on taking advantage of the new space it gives us.

 

 

 

Roof Installation

How to Install a Roof

This is what it looks like when roofing pro’s show up.  Roof sheeting is complete and the tarps pulled back giving them room to work.  This was the crew with machines to make it happen and they installed my roof in less than 2 days despite the rain.  I was starting to be able to exhale watching them work their magic.

 

 

Finished Roof

Finished Roof

And here is my finished roof.  The roof has been a long time coming, we’re looking to the next chapter of the project building out the interior.

Thanks for reading, look forward to showing the cool stuff we’ve been planning.

 

Adventurer Project Plan – Inside

By Projects

Welcome back, in this post I’ll show what we’re planning inside and thoughts about our design decisions and why we made them.  Adventurer is a big house with big rooms,  but very cut up and disjointed.  The flow of the house was very confusing and a common refrain from guests once they were inside was ‘where am I?’

This picture captures a hot button for me:  Try to find the view of the Salish Sea thru the slider and kitchen window.  Yep,  it’s there but hard to see and that needed to be fixed.  The markup you see here is what we’re planning to change.  The wall with the slider will move out 8’ and get lots of new windows and the wall to the left will disappear.  How does that happen since it’s a bearing wall?  Well, let me explain.

View Before

Original View with Changes

 

 

We’re going to install a girder truss across the house which will support the roof without needing any beams or posts.  Doing this opens up the kitchen, living room, and dining room to each other which will create a great room with lots of natural light and windows taking advantage of the view.  You can see the girder truss location in red on this floor plan.  The picture above was taken as if I were standing at the right side of the new island.  The magic of the girder truss is that it is buried in the ceiling and you won’t see it, just uninterrupted open space.

Before we move on,  I want you to pay attention to where my new office will be located in the upper left corner of the plan.  It has some spectacular views, and looks directly at Mt Baker.   When we walked thru the house the first time I was taken aback with what I saw.

Floor Plan of the Great Room

Great Room with Girder Truss

 

 

If you can’t believe what you’re seeing neither could I.  Building a sauna where a spectacular view exists isn’t common but there it was.  This may not be the biggest transformation in this project,  but it’s a contender.  I’m looking forward to moving into my new space.

Sauna pre Remodel

Sauna w/o a view

Wish I could capture the progress we’ve made so far but it doesn’t photograph very well yet.  Here’s a quick summary:

Demo work almost completed

New deck is framed

Most of the new windows and doors are installed and trimmed

Most of the exterior is re-sided

Interior framing is in progress.

 

Next project is tearing off some of the roof to install new trusses,  and then we’ll be able to reroof and seal up the exterior.  If you read my last post at the end I teased about the ‘cloud’ over part of the roof.  That ‘cloud’ is what this post is all about.

 

Thanks for reading, hoping my next post has some dramatic changes to show.   

In the Beginning – New Shed 

By Projects

This is the 1st post about our project redoing our home in Port Ludlow. AdventurerHome is the blog site name because the house is on Adventurer Lane in PL. There is good backstory on how we ended up in PL and why we chose this home and I’ll touch on those details in this and future posts. 

For those who don’t know us I’m a retired technology guy who has dabbled in construction and spent my last career years as a general contractor. Renee is my partner of many years who retired from a career in family counseling who also likes to turn houses into homes while giving them our stamp. I’m the more linear thinker and she’s more creative but we are fortunate to have enough overlap that our projects turn our better than either one of us could do alone. 

So this post is about our 1st project which was adding a storage shed. The house was built in the late 70’s and hasn’t been changed much since the original owners built it. If they did their own yardwork there weren’t signs of where their tools lived so we decided to add shed space for ours. Fortunately, there was a perfect corner spot that would make the shed look like part of the original house so we began. 

This is a corner of the house behind the garage where my new shed will be located

A Home for the New Shed, This unused corner on backside of the garage is a perfect spot to locate my new shed 

 

Our neighborhood has an HOA which has a say in house and yard improvements so I drew up plans for them and hoped they encouraged home improvement. That turned out as well as I could have hoped for and constraints were minimal and easy to meet. The shed will be tucked into the corner of the house and use 2 walls from the foundation as it’s walls to make it less obtrusive. 

I always underestimate how long site prep will take regardless of the number of projects I’ve done, and as I age it gets harder and harder to do. I still work out which allows me to keep doing this stuff, but I’m all about renting equipment whenever it’s an option. It wasn’t in this case so days with a shovel and wheelbarrow later I was able to start laying my foundation. 

Pier blocks and 2x6 treated lumber was used to build the shed foundation

Laying the Shed Foundation, Once the ground was leveled I used pier blocks and 2×6 treated lumber for the foundation 

 

I like framing because it goes pretty quickly and you get a lot of bang for the buck time spent. Unfortunately, I was framing just after the peak in the pandemic when lumber prices spiked. That was painful but my labor costs didn’t change since I was the only person onsite. Renee and I work together on most projects but this one ended up mostly in my court once she finished helping with the design. 

Standard framing, note the ledger board for 4/12 pitch roof 

Shed framing in progress , Floor is ¾” plywood, 2×4 studs, 2×6 ledger board 

 

And here’s the finished shed. It’s 16’ x 8’ and almost 11’ high where the roof meets the house. Siding is T-111 which matches the house and note the skylight. I added that because my HOA didn’t allow electricity and it adds lots of light keeping the inside bright even on cloudy rainy days. 

I’m happy with how it turned out and we use it constantly since yard projects are most of what we’ve been doing while working on design plans, permitting, and finding the skills needed for the remodel. It’s good to have the 1st project a success, it sets a good precedent for all those in the future. 

Finished shed, trimmed and painted 

Finished shed, trimmed and painted